Eva Creek wind turbine project under way near Healy Fairbanks Daily News-Miner by Dorothy Chomicz / dchomicz@newsminer.com A turbine blade is pictured on a railcar in Healy. The blades arrived in Whittier by boat and were transferred to railcar for the rest of the journey. The blades measure 148 feet long. |
No comments:
Post a Comment